THE DESIGN-BUILD PATH
Resolve the Project Before You Ask the Jobsite to Resolve It
Mathis connects consultation, design, engineering, selections, permits and construction so the handoffs do not become homeowner homework.
Reserve Your Consultation
01 · CONSULTATION
Start with the problem, wish list and range.
Mathis says the first conversation includes basic information about general project cost ranges, followed by an in-home consultation when the project is a fit.
The purpose of this step is to reduce decisions that would otherwise arrive after demolition, when choices are slower, more expensive and harder to compare.
02 · INTERIOR DESIGN
Turn preferences into a plan that can be priced and built.
For non-structural kitchen and bath work, Mathis says the interior designer may lead early planning. Layout, cabinetry, finish materials and scope are developed together.
The purpose of this step is to reduce decisions that would otherwise arrive after demolition, when choices are slower, more expensive and harder to compare.
03 · ARCHITECTURE + ENGINEERING
Add the right technical layer when structure changes.
If a project adds square footage or makes significant structural changes, architectural work enters early and engineering can be coordinated as the design develops.
The purpose of this step is to reduce decisions that would otherwise arrive after demolition, when choices are slower, more expensive and harder to compare.
04 · DOCUMENTATION
Give the project a memory before construction starts.
Mathis describes design/material selection documentation, final blueprints and 3D renderings so major decisions are not living only in conversations.
The purpose of this step is to reduce decisions that would otherwise arrive after demolition, when choices are slower, more expensive and harder to compare.
05 · PERMITS
Use local review as part of the plan.
The City of San Diego requires permits for many additions, remodels and system changes. Mathis says its designer or architect works with the local building department when permits are needed.
The purpose of this step is to reduce decisions that would otherwise arrive after demolition, when choices are slower, more expensive and harder to compare.
06 · CONSTRUCTION
Move from drawings to a managed build.
After permits are issued, Mathis says Phil Mathis becomes the main construction contact and oversees the work through completion.
The purpose of this step is to reduce decisions that would otherwise arrive after demolition, when choices are slower, more expensive and harder to compare.
BEGIN AT STEP ONE
You do not need drawings to start.
Bring the problem, the goals and the timing. The design process can develop the rest.